·欢迎光临法律顾问网   今天是:
首  页
信息中心
公司设立
劳动人事
公司运营
知识产权
合同纠纷
兼并收购
改制重组
股权纠纷
股权转让
外商投资
公司上市
房地产
破产清算
公司解散
法律法规
律师诉讼
精选案例
在线咨询
常用文本
律师文选
律师团队
服务范围
联络我们
Legal Bar
 

王宇维 律师

电话:   58619715/16/17/18
传真:    58619719
移动电话:13801158052 
网址:   http://www.lawhall.com/
E_mail:lawyerwyw@163.com
MSN:  lawyerwyw@hotmail.com
QQ:   875732212
地址: 北京朝阳区甜水园街6号中国检验检疫大厦14层(北京市长安律师事务所)

律师详细介绍>>

· 北京市各法院地址电话及交通一览
· 郎咸平炮轰证监会打压股市
· 周小川:中国经济首季总体良好
· 基金经理普遍对后市悲观只好忍痛减
· 商业银行参与股指期货管理办法有望
· 百丽国际16亿元收购江苏森达 成鞋
· 四大原因推动房价上涨 房价涨速在
· 温商大手笔收购洛阳国企 涉及收购
· 宝钢股份收购南通钢铁92.5%股

· 房地产代理销售合同
· 外商投资企业土地使用合同
· 建筑安装工程承包合同
· 北京市商品房认购书
· 商品房预售合同
· 商品房预售合同 示范文本
· 北京市劳动合同范本
· 销售确认书(凭样品买卖)
· 北京市业主大会议事规则(示范文本

· Dialogue makes important progres
· Aviation market consolidates for
· Regulation on Realty Management
· Law of the People’s Republic of
· Law of the People’s Republic of
· Foreign Trade Law of the People
· Land Administration Law of the P
· Negotiable Instruments Law of th
· Law of the People’s Republic of
 
当前位置:主页>Legal Bar>Legal Practice and Studies>正文
China completes new hydropower station
来源: 作者:

China completes new hydropower station

                                                                                            (Xinhua)

The first generating unit with a hydropower station on the Lancang River, which is known as the Mekong River after it leaves Chinese territory, started up on Thursday.

This generator is one of the three units to be installed for the first phase development at the Jinghong Hydropower Station. The two remaining units will be generating electricity in the latter half of the year, according to Na Xizhi, deputy general manager of China Huaneng Group, the investor.

The Jinghong Hydropower Station, which began construction in July 2003, will have a combined generating capacity of 1.75 million kilowatts. It has been built with a dam that is 108 meters high and 704.5 meters long on the Lancang River.

The project is a key part of China's strategy to develop its vast west and send electricity from there to the east. Apart from power generation, the project will also bring benefits such as shipping, flood control and tourism development.

With a budget of 12.3 billion yuan ($1.76 billion), the Jinghong station is the third such facility on the river.

China plans to build a group of 14 power stations on the Lancang River with a total installed capacity of 22.6 million kw. At present, the Manwan Power Station and Dachaoshan Power Station on the river are operating.

版权所有:王宇维律师